Source: 2025.09.30 - Municipality's Index shared with appellant- MA24-00546.docx
| Edit | Rec | Name of Record | Date | # pages | Status | Desc | Desc | Desc | Desc | Desc | Desc |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 56 | Closed Council Minutes dated January 24, 2024 | 2024 Jan 24 | 6 | Requested | 5: Expropriation | ||||||
| 57 | Closed Committee Minutes dated March 5, 2024 | 2024 Mar 05 | 6 | Requested | 5: Expropriation | ||||||
| 58 | Closed Committee Minutes dated April 9, 2024 | 2024 Apr 09 | 6 | Requested | 5: Expropriation | ||||||
| 59 | Closed Council Minutes dated April 24, 2024 | 2024 Apr 24 | 4 | Requested | 5: Expropriation | ||||||
| 60 | Closed Council Minutes dated June 19, 2024 | ----- | 3 | Requested | 5: Expropriation | ||||||
| 62 | Closed Council Minutes dated November 8, 2023 | 2023 Nov 08 | 4 | Requested | 5: Expropriation | 6: Planning Department Meetings | 18: Financing of Land | ||||
| Request release of 5: Expropriation, 6: Planning Department Meetings and 18: Financing of Land | |||||||||||
| 63 | Council Package dated April 9 | ----- | 8 | Requested | 5: Expropriation | 9: Industry Water Consumption | |||||
| 64 | Expropriation Info Sheet | ----- | 3 | Requested | 5: Expropriation | ||||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 11 in the FIR Summary document. | |||||||||||
| 66 | Updated Background Note | ----- | 3 | Requested | 5: Expropriation | 7: Type of Industries | 19: Budget for Township, Prov, & Fed | ||||
| 68 | Schedule | ----- | 1 | Requested | 5: Expropriation | ||||||
| 69 | Presentation Update | ----- | 8 | Requested | 5: Expropriation | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | |||
| 70 | Information Package for Landowners | ----- | 5 | Requested | 5: Expropriation | ||||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 8 in the FIR Summary document. | |||||||||||
| 72 | Land Assembly Communications - Presentation | ----- | 17 | Requested | 5: Expropriation | ||||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 9 in the FIR Summary document. | |||||||||||
| 75 | Letter Re: Consulting Services | ----- | 13 | Requested | 5: Expropriation | ||||||
| 76 | Letter dated April 30, 2024 | 2024 Apr 30 | 2 | Requested | 5: Expropriation | ||||||
| 77 | Plan dated April 1, 2024 (unsigned) | 2024 Apr 01 | 18 | Requested | 5: Expropriation | 19: Budget for Township, Prov, & Fed | |||||
| 78 | Summary Table for Committee January 11, 2023 | 2023 Jan 11 | 3 | Requested | 5: Expropriation | 7: Type of Industries | 8: Alternate Sites | ||||
| 79 | ----- | 4 | Requested | 5: Expropriation | |||||||
| 80 | Email: FW: Letter of Engagement Attachment: 1. Letter Re: Consulting Services | ----- | 1 | Requested | 5: Expropriation | ||||||
| 83 | Email: Engagement letter Attachment: 1. Letter Re: Consulting Services | ----- | 2 | Requested | 5: Expropriation | ||||||
| 84 | ----- | 4 | Requested | 5: Expropriation | |||||||
| 85 | Email: FW: Engagement Letter Attachment: 1. Draft Letter - Consulting Services | ----- | 2 | Requested | 5: Expropriation | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 86 | Email: Closed Council Meeting Attachment: 1. Closed Council Minutes - November 8, 2023 | 2023 Nov 08 | 1 | Requested | 5: Expropriation | 6: Planning Department Meetings | |||||
| Request 5: Expropriation and 6: Planning Department Meetings | |||||||||||
| 87 | Email: Closed Council Meeting Attachment: 1. Updated Background Notes | ----- | 1 | Requested | 5: Expropriation | 7: Type of Industries | 19: Budget for Township, Prov, & Fed | ||||
| Request 5: Expropriation, 7: Type of Industries and 19: Budget for Township, Prov, & Fed | |||||||||||
| 89 | Email: Gantt Chart Attachment: 1. Gantt Chart | ----- | 3 | Requested | 5: Expropriation | ||||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 10 in the FIR Summary document. | |||||||||||
| 90 | Email: Re: Draft Update Report | ----- | 4 | Requested | 5: Expropriation | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 93 | Employment Sites Summary Sheets | ----- | 14 | Requested | 6: Planning Department Meetings | ||||||
| 94 | Email: Re: Early site grading - permitting requirements | ----- | 4 | Requested | 6: Planning Department Meetings | ||||||
| 95 | Request for Proposal March 1, 2023 (Instructions) | 2023 Mar 01 | 17 | Requested | 7: Type of Industries | ||||||
| 96 | ----- | 2 | Requested | 7: Type of Industries | |||||||
| 97 | ----- | 1 | Requested | 7: Type of Industries | |||||||
| 98 | Email: Land Assembly project | ----- | 1 | Requested | 7: Type of Industries | ||||||
| 99 | Email from resident | ----- | 2 | Requested | 7: Type of Industries | ||||||
| 100 | Email: Emails from the weekend Attachments: 1. Land Assembly Project.msg 2. Land Assembly Project.msg 3. Land Assembly Project.msg 4. Land Assembly Project.msg 5. Land Assembly Project.msg 6. Land Assembly.msg | ----- | 8 | Requested | 7: Type of Industries | ||||||
| 101 | Technical Assessment of Candidate Sites - Final Draft 08.12.23 | 2023 Dec 08 | 14 | Requested | 8: Alternate Sites | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 102 | Stakeholder Submission | ----- | 113 | Requested | 8: Alternate Sites | ||||||
| 103 | Waterloo Region sites information | ----- | 8 | Requested | 8: Alternate Sites | ||||||
| 104 | Site Evaluation - Early Insights | ----- | 1 | Requested | 8: Alternate Sites | ||||||
| 105 | Guiding Principles and Assessment Factors 22Nov2022 | 2022 Nov 22 | 2 | Requested | 8: Alternate Sites | ||||||
| 106 | Assessment of Sites Document | ----- | 9 | Requested | 8: Alternate Sites | ||||||
| 108 | Assessment Criteria Update | ----- | 2 | Requested | 8: Alternate Sites | ||||||
| 109 | Preliminary Assessment Factors updated 22Nov2022 rev | 2022 Nov 22 | 2 | Requested | 8: Alternate Sites | ||||||
| 110 | Preliminary Estimates Total Site Costs 12December2022 | 2022 Dec 12 | 1 | Requested | 8: Alternate Sites | ||||||
| 111 | Site Summary Confidential | ----- | 8 | Requested | 8: Alternate Sites | ||||||
See Note 13 in the FIR Summary document. | |||||||||||
| 112 | Suggested Approach for Updated Servicing Analysis 3Feb2023 | 2023 Feb 03 | 2 | Requested | 7: Type of Industries | ||||||
| 113 | Summary Tables | ----- | 3 | Requested | 8: Alternate Sites | ||||||
| 114 | Map | ----- | 1 | Requested | 8: Alternate Sites | ||||||
This is a placeholder for 8: Alternate Sites to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 12 in the FIR Summary document. | |||||||||||
| 118 | Cost Estimates | ----- | 1 | Requested | 8: Alternate Sites | ||||||
| 121 | Land Use Planning Document | ----- | 46 | Requested | 9: Industry Water Consumption | ||||||
| 122 | Utility Information | ----- | 6 | Requested | 9: Industry Water Consumption | ||||||
| 124 | Site Summary Document | ----- | 9 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
See Note 13 in the FIR Summary document. | |||||||||||
| 125 | Water Wastewater Memo | ----- | 16 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 126 | ----- | 3 | Requested | 9: Industry Water Consumption | |||||||
| 127 | Email: Attachments: 1. Map 2. Map | ----- | 5 | Requested | 9: Industry Water Consumption | ||||||
This is a placeholder for 9: Industry Water Consumption to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 12 in the FIR Summary document. | |||||||||||
| 128 | Email: from resident | ----- | 1 | Requested | 9: Industry Water Consumption | ||||||
| 129 | Email: from resident | ----- | 1 | Requested | 9: Industry Water Consumption | ||||||
| 130 | Email: from resident | ----- | 1 | Requested | 9: Industry Water Consumption | ||||||
| 133 | ----- | 2 | Requested | 9: Industry Water Consumption | |||||||
| 135 | Memo - Servicing | ----- | 3 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 137 | Email: Water/Wastewater servicing estimates Attachment: 1. Water Wastewater Memo | ----- | 1 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 138 | Waterloo Region Presentation | ----- | 23 | Requested | 11: Rail Access and CN North | 12: Rail Crossing Hwy 7/8 | |||||
| 139 | Transportation Impact Study | ----- | 277 | Requested | 14: Traffic Studies | 15: Road Upgrades to Hwy 7/8 | 16: Cost to Upgrade Local Roads | ||||
| 140 | RFP Submission with costing | ----- | 33 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | 15: Road Upgrades to Hwy 7/8 | 17: Upgrade of Wastewater Treatment & Pipeline | |
| 141 | Submitted Version of RFP | ----- | 26 | Requested | 8: Alternate Sites | 17: Upgrade of Wastewater Treatment & Pipeline | |||||
| 142 | Email: Land Acquisition Attachment: 1. letter from MPP | ----- | 3 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 143 | Email: RE Your response | ----- | 11 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 144 | Email: Land Assembly Attachment: 1. Agreement Fully Executed.pdf | ----- | 64 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | 18: Financing of Land | |||||
See Note 1 in the FIR Summary document. | |||||||||||
| 145 | Email: RE: Infrastructure | ----- | 8 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 148 | Email: RE: Hydro Attachments: 1. Parcel Configuration.pdf 2. Request for Information 3. Site Access.pdf 4. Topography.pdf 5. Utility Electrical.pdf 6. Utility Enbridge Gas.pdf 7. Utility Water Wastewater.pdf 8. Zoning.pdf 9. Candidate Sites.pdf 10. Easements ROW.pdf | ----- | 20 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | 8: Alternate Sites | 9: Industry Water Consumption | 17: Upgrade of Wastewater Treatment & Pipeline | |||
| 149 | Email: RE: Water | ----- | 2 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 150 | Email Re: Update Attachment: 1. Water Wastewater Memo | ----- | 4 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 152 | Email: Change in Scope - Fully Executed Attachment: 1. Change is Scope | ----- | 1 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 154 | Email 1. Change is Scope | ----- | 3 | Requested | 17: Upgrade of Wastewater Treatment & Pipeline | ||||||
| 155 | Email: Update Schedule D-2 and Schedule D-3 Attachments: 1. Schedule_D-2 2. Schedule_D-3 | ----- | 8 | Requested | 5: Expropriation | 17: Upgrade of Wastewater Treatment & Pipeline | |||||
| 158 | ----- | 0 | Requested | ||||||||
| 159 | Draft Closed Council Report | ----- | 5 | Requested | 18: Financing of Land | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 161 | ----- | 1 | Requested | 7: Type of Industries | |||||||
| 162 | Email: Anything from CAO Attachments: 1. Closed Report PDL-ECD-23-004 & Slide deck (note: probably meant to be PDL-ECD-23-004) | ----- | 22 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | ||||
| Request release of 7: Type of Industries, 8: Alternate Sites, and 9: Industry Water Consumption.
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 2 in the FIR Summary document. | |||||||||||
| 164 | Email: Closed reports Attachments: 1. PDL-EDC-22-02 PDC-EDC-22-01 (Non-Responsive) | ----- | 4 | Requested | 8: Alternate Sites | ||||||
| 165 | Email: Communications Package Attachment 1. Land Acquisition Communications Package | ----- | 9 | Requested | 5: Expropriation | 19: Budget for Township, Prov, & Fed | |||||
| 167 | Email: Attachments: 1. Water and Wastewater Servicing Details.pdf 2. Hydro One Electricity Connection 20230828.pdf 3. Ontario Value Proposition - September 2023.pdf 4. Economic Development and Energy Planning.pdf 5. RFP | ----- | 151 | Requested | 6: Planning Department Meetings | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | 11: Rail Access and CN North | ||
| 168 | Email: Costing Estimates and letter Attachments: 1. Costing Estimates 2. Support letter | ----- | 3 | Requested | 9: Industry Water Consumption | 12: Rail Crossing Hwy 7/8 | 15: Road Upgrades to Hwy 7/8 | 18: Financing of Land | 19: Budget for Township, Prov, & Fed | ||
| 169 | Email: Council Report | ----- | 1 | Requested | |||||||
| 171 | Email: Feb 2023 Update Attachment: 1. Slides | ----- | 21 | Requested | 5: Expropriation | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | |||
| 173 | Email: Early Results Slide Attachment: 1. PDL-EDC-23-004 | ----- | 5 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | |||
| 178 | Email: New economic development opportunity | ----- | 1 | Requested | 7: Type of Industries | ||||||
| 179 | Email: Scope Changes Attachment: 1. Change in Scope | ----- | 3 | Requested | 15: Road Upgrades to Hwy 7/8 | 16: Cost to Upgrade Local Roads | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 181 | Email: Infrastructure Timeline | ----- | 4 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 182 | Email: Infrastructure Timeline | ----- | 3 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 183 | Email: Infrastructure Timeline | ----- | 4 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 184 | Email: Servicing timelines | ----- | 1 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 186 | Email: Geotechnical Drilling Attachments: 1. Air Photo 2. Air Photo 3. Air Photo | ----- | 5 | Requested | 9: Industry Water Consumption | ||||||
| 189 | Email: site mapping Attachments: 1. Map 2. Map 3. Map 4. Map 5. Map | ----- | 6 | Requested | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | |||||
This is a placeholder for 10: Industry Sewage and 17: Upgrade of Wastewater Treatment & Pipeline to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 12 in the FIR Summary document. | |||||||||||
| 193 | Email: Servicing Attachments: 1. Memo - Servicing | ----- | 2 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 17: Upgrade of Wastewater Treatment & Pipeline | ||||
| 197 | Email: Attachments: 1. (see excel file will not PDF in readable format) 2. (blank excel document) 3. Draft RFP | ----- | 19 | Requested | 6: Planning Department Meetings | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 199 | Email: Transportation assumptions | ----- | 3 | Requested | 6: Planning Department Meetings | 15: Road Upgrades to Hwy 7/8 | |||||
| 200 | Email: | ----- | 2 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 201 | Email: Attachment: 1. Infrastructure Costing | ----- | 6 | Requested | 16: Cost to Upgrade Local Roads | ||||||
| 202 | Email: Attachments: 1. Map 2. Map 3. Map | ----- | 12 | Requested | 11: Rail Access and CN North | 15: Road Upgrades to Hwy 7/8 | |||||
This is a placeholder for 11: Rail Access and CN North and 15: Road Upgrades to Hwy 7/8 to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 12 in the FIR Summary document. | |||||||||||
| 207 | Email: Traffic assessment | ----- | 2 | Requested | 14: Traffic Studies | ||||||
| 208 | Email: Infrastructure Review Attachments: 1. RFP 2. Site Summary Document | ----- | 23 | Requested | 5: Expropriation | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | 11: Rail Access and CN North | 14: Traffic Studies | |
See Note 13 in the FIR Summary document. | |||||||||||
| 209 | Email: RFP Attachment: 1. RFP Response | ----- | 22 | Requested | 5: Expropriation | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | 11: Rail Access and CN North | 14: Traffic Studies | |
| 210 | Email: RFP Attachments: 1. RFP 2. Draft Letter | ----- | 28 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 16: Cost to Upgrade Local Roads | ||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 211 | Email: RFP Attachment: 1. RFP 2. letter template | ----- | 2 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 16: Cost to Upgrade Local Roads | ||||
| 212 | Email: RFP | ----- | 3 | Requested | 8: Alternate Sites | ||||||
| 213 | Email: Water Wastewater Servicing | ----- | 1 | Requested | 19: Budget for Township, Prov, & Fed | ||||||
| 214 | Email: RFP Attachment: 1. RFP Response | ----- | 52 | Requested | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 215 | Email: RFP Attachment: 1. RFP | ----- | 1 | Requested | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 216 | Email: RFP Attachment: 1. RFP | ----- | 1 | Requested | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 217 | Email: | ----- | 3 | Requested | 7: Type of Industries | ||||||
| 218 | Email: Attachments: 1. Project Requirements 2. Site Specs | ----- | 12 | Requested | 7: Type of Industries | ||||||
| 220 | Email: Meeting | ----- | 1 | Requested | 6: Planning Department Meetings | ||||||
| 225 | Email: Slide Deck Attachment: 1. Slide Deck | ----- | 1 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | ||||
| 227 | Email: Draft Closed Council Report | ----- | 1 | Requested | 19: Budget for Township, Prov, & Fed | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 228 | Email: Draft Closed Council Report | ----- | 1 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 229 | Email: | ----- | 1 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 230 | Email: Slide Deck Attachment: 1. Slide Deck | ----- | 1 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 232 | Email: Update | ----- | 1 | Requested | 7: Type of Industries | ||||||
| 233 | Email: Council Slides Attachment: 1. Slide Deck | ----- | 7 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | 16: Cost to Upgrade Local Roads | ||||
| 236 | Email: Costs Chart Attachment: 1. Costs Chart | ----- | 3 | Requested | 5: Expropriation | 18: Financing of Land | |||||
| 242.1 | Email: Draft Communications Attachment: 1. Draft Communications | ----- | 6 | Requested | 5: Expropriation | ||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 242.2 | Email: google sheet | ----- | 1 | Requested | |||||||
| duplicate number - unknown topic
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 243 | Email: Material for Review | ----- | 1 | Requested | 8: Alternate Sites | ||||||
| 244 | Email: Word Doc Attachment: 1. RFP | ----- | 34 | Requested | 7: Type of Industries | 9: Industry Water Consumption | |||||
| 245 | Email: Email Attachments: 1. Presentation 2. Presentation 3. Presentation | ----- | 65 | Requested | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 246 | Email: RFP Attachments: 1. RFP Submission with Costing 2. Submitted version of RFP 3. Draft RFP | ----- | 1 | Requested | |||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 247 | Email: Transportation | ----- | 1 | Requested | 14: Traffic Studies | 15: Road Upgrades to Hwy 7/8 | 16: Cost to Upgrade Local Roads | ||||
| 248 | Email: Update and Resourcing | ----- | 1 | Requested | 18: Financing of Land | 19: Budget for Township, Prov, & Fed | |||||
| 249 | Email: Update and Resourcing | ----- | 1 | Requested | 18: Financing of Land | ||||||
| 250 | Email: Update and Resourcing | ----- | 1 | Requested | 18: Financing of Land | ||||||
| 251 | Email: Word Doc Draft | ----- | 1 | Requested | |||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 252 | Email: presentations Attachments: 1. Presentation 2. Presentation 3. Presentation 4. Presentation | ----- | 87 | Requested | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 253 | Email: site specs | ----- | 2 | Requested | 5: Expropriation | 11: Rail Access and CN North | |||||
| 254 | Email: | ----- | 1 | Requested | 7: Type of Industries | ||||||
| 255 | Email: Transportation | ----- | 2 | Requested | 15: Road Upgrades to Hwy 7/8 | 16: Cost to Upgrade Local Roads | |||||
| 256 | Email: Attachment: 1. Presentation | ----- | 6 | Requested | 5: Expropriation | 6: Planning Department Meetings | 7: Type of Industries | 8: Alternate Sites | 18: Financing of Land | ||
| 257 | Email: Closed Committee Report | ----- | 1 | Requested | |||||||
| 258 | Email: | ----- | 3 | Requested | 8: Alternate Sites | ||||||
| 260 | Email: | ----- | 5 | Requested | 16: Cost to Upgrade Local Roads | ||||||
| 263 | Email: Cost Estimates Attachment: 1. Costs Preliminary | ----- | 6 | Requested | 15: Road Upgrades to Hwy 7/8 | ||||||
| 264 | Email: Attachment: 1. RFP Response | ----- | 4 | Requested | 7: Type of Industries | 9: Industry Water Consumption | 15: Road Upgrades to Hwy 7/8 | ||||
| 265 | Email: Timeline | ----- | 6 | Requested | 5: Expropriation | ||||||
| 266 | Email: Cost Estimates | ----- | 1 | Requested | 18: Financing of Land | ||||||
| 267 | Email: Cost Estimates | ----- | 1 | Requested | 18: Financing of Land | ||||||
| 268 | Email: Attachment: 1. RFP | ----- | 37 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 269 | Email: Attachment: 1. RFP | ----- | 21 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 270 | Email: Attachment: 1. Site Evaluation | ----- | 4 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 271 | Email: meeting agenda | ----- | 4 | Requested | 15: Road Upgrades to Hwy 7/8 | 16: Cost to Upgrade Local Roads | |||||
| 272 | Email: NDA Attachment: 1. NDA | ----- | 9 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 281 | Email: Number of Landowners | ----- | 7 | Requested | |||||||
| 282 | Email: Attachment: 1. Gantt Chart | ----- | 5 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 10 in the FIR Summary document. | |||||||||||
| 283 | Email: update. | ----- | 4 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 284 | Email: update. | ----- | 4 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 285 | Email: update. | ----- | 4 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 286 | Email: update. Attachment: 1. Risk Memo | ----- | 20 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 14 in the FIR Summary document. | |||||||||||
| 287 | Email: | ----- | 2 | Requested | 9: Industry Water Consumption | 10: Industry Sewage | |||||
| 288 | Email: Attachment: 1. Change in Scope | ----- | 5 | Requested | 7: Type of Industries | ||||||
| 289 | Email: | ----- | 2 | Requested | 7: Type of Industries | ||||||
| 293 | Email: Land Acquisition Costs Chart Attachment: 1. Chart | ----- | 4 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 295 | Email: update | ----- | 1 | Requested | |||||||
| 298 | Email: Land Assembly Agreement Attachment: 1. Land Assembly Agreement | ----- | 68 | Requested | |||||||
| We request the release of this document since it does not cross reference the NDA.
The number of pages suggests that this is not the final version. This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 1 in the FIR Summary document. | |||||||||||
| 299 | Email: site due diligence | ----- | 2 | Requested | 5: Expropriation | 9: Industry Water Consumption | 14: Traffic Studies | ||||
| 300 | Email: WW Update | ----- | 3 | Requested | 10: Industry Sewage | ||||||
| 301 | Email: Follow-up & Next Steps Attachment: 1. Slides | ----- | 16 | Requested | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 303 | Email: Follow-up & Next Steps | ----- | 5 | Requested | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 305 | Email: Update and Resourcing | ----- | 3 | Requested | 18: Financing of Land | ||||||
| 306 | Email: Update and Resourcing Attachment: 1. Costs Table | ----- | 3 | Requested | 5: Expropriation | 18: Financing of Land | |||||
| 307 | Email: Word Doc Draft | ----- | 2 | Requested | |||||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 308 | Email: Attachment: 1. Email message & Maps | ----- | 7 | Requested | 14: Traffic Studies | 6: Planning Department Meetings | |||||
This is a placeholder for 14: Traffic Studies and 6: Planning Department Meetings to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 12 in the FIR Summary document. | |||||||||||
| 309 | Email: RFP package Attachment: 1. RFP | ----- | 36 | Requested | 6: Planning Department Meetings | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | 11: Rail Access and CN North | ||
| 314 | Email: Servicing | ----- | 6 | Requested | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | ||||
| 317 | Email: | ----- | 3 | Requested | 14: Traffic Studies | ||||||
| 318 | Email: RFP Attachment: 1. RFP | ----- | 31 | Requested | 6: Planning Department Meetings | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | 11: Rail Access and CN North | ||
| 319 | Email: Attachment: 1. RFP | ----- | 1 | Requested | 6: Planning Department Meetings | 7: Type of Industries | 9: Industry Water Consumption | 10: Industry Sewage | 11: Rail Access and CN North | ||
| 320 | Email: | ----- | 3 | Requested | 7: Type of Industries | ||||||
| 321 | Email: | ----- | 3 | Requested | 7: Type of Industries | ||||||
| 322 | Email: Study Areas | ----- | 2 | Requested | 14: Traffic Studies | ||||||
| 324 | Email: | ----- | 6 | Requested | 6: Planning Department Meetings | ||||||
| 325 | Email: Attachment: 1. Presentation | ----- | 27 | Requested | 9: Industry Water Consumption | ||||||
| 328 | Email: Revised Property Acquisition Information Sheet Attachment: 1. Property Acquisition Process | ----- | 4 | Requested | 5: Expropriation | ||||||
This is a placeholder to maintain the correct number of pages for Withheld, Maybe Withheld, Request and Partial Request. See Note 7 in the FIR Summary document. | |||||||||||
| 329 | Email: slide deck Attachment: 1. Slides | ----- | 65 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | |||
| 330 | Email: Slides Attachment: 1. Slides | ----- | 1 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | |||
| 330 | Email: Slides | ----- | 1 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | |||
| 331 | Email: Attachment: 1. Slide Deck | ----- | 19 | Requested | 7: Type of Industries | 8: Alternate Sites | 9: Industry Water Consumption | 10: Industry Sewage | |||
| 333 | Email: RFP Attachments: 1. Blank excel document 2. Draft RFP 3. (See excel file will not pdf in readable format) | ----- | 1 | Requested | 7: Type of Industries | 8: Alternate Sites | |||||
This is a draft document and no final version was found. This request may be withdrawn if a final version of the document is identified. | |||||||||||
| 334 | Email: RFP Attachment: 1. RFP | ----- | 27 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 335 | Email: Transportation assumptions Attachment: 1. Concept Plan | ----- | 6 | Requested | |||||||
No cross reference. This request may be withdrawn if the cross reference to our FIR is provided. | |||||||||||
| 336 | Email: Water_Wastewater Info | ----- | 1 | Requested | |||||||
| 188 | 2108 | ||||||||||